|
|
|
|
|
|
| Implementation
Phase : 4 |
| (
MID- Term Review Of performance) |
|
 |
MID
- term review at the end of six
months of MOU. |
 |
Evaluate
actual performance and achievements
v/s those projected - in MOU /
diagnostic study report. |
 |
Take
corrective action to achieve targets
set by diagnostic study report./
MOU - If required |
|
|
| All
rights of this site is reserved to Global
Technical Services. site design and maintained by Mod Graphics |
|
|
|
|